APS Surveying Services


Major Highway Construction / Improvements

2010 06 07 A1D2B 129 150x150 Major Highway Construction / ImprovementsAPS has worked on a number of Major Highway Construction and Maintenance schemes as supplier of Resident Engineers to Main Contractors; most recently the M1 widening from junction 25 to junction 28 and currently on  the A1 between Dishforth to Barton.

APS are expert in  processing data from the design team in the form of Ground Models (MX Data/TIN) showing existing and proposed ground levels.  This information is analysed by our Engineering Team and the required engineered feature is set out in the field, either as a cut or fill embankment or straightforward road profile etc.

P71203441 300x225 Major Highway Construction / ImprovementsDesign data can be generated into various formats to suit Machine Guidance systems in the field. LEICA/TRIMBLE/TOPCON systems are some of the formats produced which can then be added to the relevant Dozer, Excavator or Grader.